U.S. Army Corps of Engineers: Missouri River reservoir system prepared for 2021 runoff season

U.S. Army Corps of Engineers: Missouri River reservoir system prepared for 2021 runoff season

(Source: U.S. Army Corps of Engineers) — The full flood control capacity of the Missouri River Mainstem Reservoir System is available for the 2021 runoff season. “All 2020 flood water stored in the annual flood control zone has been evacuated as of December 21,”...